EN IT

Track Record

Track Record

OVERVIEW

406 MW installed. 2.781 systems completed. From 2007 to the present day.

COMPANY KPI
0
MWp of installed photovoltaic capacity
+ 0
systems completed across photovoltaic and storage
+ 0
years of experience in the energy sector

Selected projects.

A selection of representative projects showcasing our execution capability at industrial scale, across multiple sites and on contracts awarded through competitive tender.

Mappa Three ground-mounted systems, 24.4 MWp.
Northern Italy
Technical Details
Potenza 24.488,10 kWp
Impianti 3
Configurazione 2 × 8 MW + 1 × ~9 MW
Tempistiche ~6 months per system
Superficie 44152 mq
Technology Solar tracking system (tracker)
Award Competitive tender
Ground-Mounted Photovoltaic — Utility Scale

Three ground-mounted systems, 24.4 MWp.

Three ground-mounted photovoltaic parks with solar tracking systems, built for an international renewable energy operator. Total capacity: 24.4 MWp.

Seven sites, one vision. 7.4 MWp.
Mappa Seven sites, one vision. 7.4 MWp.
Genova, Rimini, Gorizia, Parma, Bologna, Brescia, Salerno
Technical Details
Potenza 7,4 MWp
Tempistiche ~6 months per system
Award Competitive tender
Works included Repowering, revamping, roof resurfacing
Rooftop Photovoltaic — Multi-site

Seven sites, one vision. 7.4 MWp.

Multi-site industrial rooftop project, initially launched as a pilot and expanded to 7 sites following proven results. Including repowering and roof resurfacing works.

Energy storage. 645 kWh BESS.
Mappa Energy storage. 645 kWh BESS.
Italy — Multi-site
Technical Details
Potenza 645 kWh
Configurazione 3 battery packs × 215 kWh
Tempistiche ~2 months
Superficie 44152 mq
Integration On existing photovoltaic system
Battery Energy Storage System (BESS)

Energy storage. 645 kWh BESS.

BESS system integrated into an existing photovoltaic installation for an agricultural business. Objective: 24/7 self-consumption, reduction of energy costs, access to GSE incentives.

Mappa Ground-mounted system. ~10 MWp.
Italy — Multi-site
Technical Details
Potenza 9.998,10 kWp
Configurazione Solar tracking system (tracker)
Tempistiche ~4 months
Complexity Archaeological excavation, winter conditions
Acquisition Through direct network
Ground-Mounted Photovoltaic — Agrivoltaic / Industrial

Ground-mounted system. ~10 MWp.

Ground-mounted system with solar trackers completed in 4 months despite significant operational challenges: winter weather conditions and management of archaeological findings during excavation.